Infrastructure

Rail

  • Largest

    Rail track length of 8949 Kms

  • 5

    Railway Zones

  • Railway density

    Twice of Nation’s average (40 km)

Road


  • Largest Road Network in India


  • 4 Lakh Km Total Road Length


  • 11,737 Km Total National Highway


  • 2nd In India in Total N.H. Network Length Presence


  • 7,147 Km Total State Highway


  • 1.7 Lakh Kms Other Roads

Metro Rail

  • 2 Metro Rail Operating Cities (Lucknow & Noida)
  • 2 Metro Rail Projects under construction (Kanpur & Agra)
  • 5 Upcoming Metro Rail Projects (Meerut, Gorakhpur, Bareilly, Prayagraj, Varanasi)

Lucknow Metro Rail
Network Length: 23.732 Kms
Current Daily Average Ridership(in Feb,2020): 1936
No. of stations: 21

Noida Metro Rail
Network Length: 29.7 Kms
Current Daily Average Ridership(in Feb,2020): 25907
No. of stations: 21

Inland Waterways

  • India’s 1st Inland Waterway in UP
  • NW1 connecting major exporting hubs to Haldia Port via Varanasi & Prayagraj
  • 26% catchment Area of NW-1 in UP
  • 27 million tonnes volume expected to move on NW-1 by 2023
  • India’s 1st Multi Modal Terminal at Varanasi on NW1
  • Other NW1 Terminals
    Varanasi MMT
    Assi Ghat, Varanasi
    Rajghat, Varanasi
  • 425 Kms Total Navigable Water length in UP
  • 10 other Upcoming National Waterways will benefit UP

Air Connectivity

  • 7

    Airports/Airstrips
  • 5

    Domestic Airports
  • 2

    International Airports
  • 51

    Number of cities connected
    domestically from the State
  • 12

    Number of cities connected
    internationally from the State
     
  • 3

    Airports completed under
    RCS Phase 1&2
    (Prayagraj, Hindon, Bareilly)
  • 6

    Projects under progress
    under RCS phase 1&2
    (Kanpur, Agra, Azamgarh, Moradabad & Shravasti)
  • 5

    New projects identified
    under RCS Phase 3
    (Ayodhya, Kushinagar, Sarsawa, Gazipur & Meerut)

Passenger Traffic No.(2019-2020)

  • 16,735 in Agra Airport
  • 2,12,017 in Kanpur(Chakeri) Airport
  • 4,14,064 in Prayagraj Airport
  • 6,65,703 in Gorakhpur Airport
  • 30,10,702 in Varanasi Airport
  • 54,33,757 in Lucknow Airport

Aircraft Movement (2019-2020)

  • 738 in Agra Airport
  • 1,960 in Kanpur(Chakeri) Airport
  • 4,056 in Prayagraj Airport
  • 5,032 in Gorakhpur Airport
  • 24,056 in Varanasi Airport
  • 38,494 in Lucknow Airport

Jewar Airport

Jewar Airport Largest Airport in India (PPP Mode, NAIL and Zurich Airport by 2023)Spread over 5000 hectares area 50 million passenger traffic capacity
1800 Cr worth MRO & Cargo Hub Expected Aerotropolis

Expressways

  • State of the art expressways for seamless connectivity with access controlled navigation
  • Existing Yamuna & Agra-Lucknow Expressway connecting the State Capital to National Capital Region
  • 302 kms Agra Lucknow Expressway is one of the longest expressways in India
  • Proposed Poorvanchal Expressway & Bundelkhand Expressway to connect the exporting hubs in eastern and Bundelkhand region
  • Lucknow-Azamgarh-Ghazipur- Expressway known as Purvanchal Expressway is an under construction 6-lane, divided and access-controlled 343 km long
  • Upcoming 603 kms long Ganga Expressway will be one of India’s longest expressway, connecting key exporting hubs
  • 296 kms long Bundelkhand Expressway is an under construction, 4lane Controlled-access highway, Broad route, connecting Chitrakoot-Banda-Orai-Jalaun-Auraiya-Etawah
  • Gorakhpur Link Expressway will connect North eastern UP viz. Gorakhpur area through the Purvanchal Expressway to Lucknow, Agra and Delhi with smooth traffic corridor.

Corridors

Delhi Mumbai Industrial Corridor

  • 8.5% of DMIC catchment area

    (36,068 sq. km) across 12 districts

  • Expected investment of Rs 27,400 Cr & 1.2 million Job creation
Western Dedicated Freight Corridor (WDFC) along DMIC

Projects along DMIC-WDFC

  • Boraki Integrated Transport Hub
  • Dadri – Noida – Ghaziabad Investment Region
  • Integrated Industrial Township at Greater Noida
  • Integrated Multi Modal Logistic Hub at G.Noida near Dadri

Amritsar Kolkata Industrial Corridor

  • 57% of AKIC catchment area

    across 17 districts

  • Expected investment of More than Rs 50,000 Cr
Eastern Dedicated Freight Corridor (EDFC) along AKIC
Highest share of EDFC in UP

Projects along AKIC-EDFC

  • 3 Integrated manufacturing clusters around 18 identified railway stations
  • Development of 3 industrial clusters –
    • Auraiya, Kannauj- Kanpur Cluster
    • Prayagraj-Varanasi Cluster
    • Agra- Aligarh Cluster

UP Defence Industrial Corridors

  • One of the 2 Defence Industrial Corridors in India
  • Expected Investment approx. Rs 50,000 Cr & 2.5 lakh job opportunities
  • 6 identified nodes: Aligarh, Agra, Jhansi, Chitrakut, Kanpur & Lucknow
  • ~5071.19 Hectares Land bank identified, of which 3796 hectares has been acquired
  • IIT Kanpur and IIT BHU identified for setting up Centre of Excellence worth Rs. 50 Cr & Rs. 69 Cr respectively
  • Land allotment policy & incentive policy announced