The Indian semiconductor market expected to grow at a CAGR of ~20% over the next decade, accounting for ~17% of the global market driven by a strong domestic demand across sectors - Automotive, Consumer Electronics and Telecom
Only 9% of India’s semiconductor components were locally sourced in 2021. 17% local sourcing expected by 2026
80% of the total revenue in Indian semiconductor industry stemmed from mobile phones, smart wearables, IT and other industrial components
UP is currently the largest exporter of consumer electronics in India and is considered as a potential hub for semiconductor design and R&D offices
Establish Uttar Pradesh as a hub of semiconductor ecosystem
Aiding chip manufacturing Eligibility Criteria Projects qualified under any of the following schemes of India Semiconductor Mission by the GoI:
3 Electronics Manufacturing Clusters (EMC) focusing on mobile manufacturing, consumer durables, Drone, Semiconductor (FAB) defense electronics, Robotics, IoT etc.
Semiconductor Design - Embedded software development, VLSI design and Hardware/board design
Semi-conductor wafer fabrication manufacturing, Light Emitting Diode (LED) manufacturing and Liquid Crystal Display (LCD) manufacturing
Semiconductor manufacturing zones within ESDM and Auto hubs, with essential supporting infrastructure to also host ancillary & downstream industries:
Sr. No. | Department Name | Service Name | Timeline (Days) | Category | Criteria | |
---|---|---|---|---|---|---|
Board of Revenue Website Link |
Land Purchase Permission (Dhara 89) | 60 | Pre-Establishment | In case applicant wants to purchase more than 12.5 Acre Land | ||
Change of Land Use (Section 80) | 45 | Pre-Establishment | In case applicant wants to change agriculture land to non-agriculture land | |||
Department of Labor Website Link |
Approval of plan and permission to construct/extend/or take into use any building as a factory under the Factories Act, 1948 | 30 | Pre-Establishment | If factory having 40 or more workers without power. Or Factory having 20 or more workers with power. | ||
Registration and grant of license under The Factories Act, 1948 | 30 | Pre-Establishment | If factory having 40 or more workers without power. Or Factory having 20 or more workers with power. | |||
Registration of principal employer's establishment under provision of The Contracts Labor (Regulation and Abolition) Act, 1970 | 30 | Pre-Operation | Every establishment in which 50 or more workmen are employed | |||
Registration of establishment under the Inter State Migrant Workmen (RE/CS) Act, 1979 | 30 | Pre-Operation | Every establishment in which 5 or more inter-state migrant workmen are employed. | |||
Registration under The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 | 30 | Pre-Operation | Govt - Unit any number and Pvt unit 10 and more employee and Investment 10 Lac and above any number of employees | |||
Department of Stamp and Registration Website Link |
Property Registration | 1 | Pre-Establishment | If applicant wants to register properties | ||
Pollution Control Board Website Link |
Consent to Establish Under Air and Water Act (NOC) | 120 | Pre-Establishment | Mandatory | ||
Consolidated Form for Consent under Water Act 1974 Air Act 1981 and authorization under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules 2016 | 120 | Pre-Operation | Mandatory | |||
Authorization under E-Waste (Management) Rules 2016 | 120 | Pre-Operation | If applicant deals with e- waste | |||
Registration under Plastic Waste Management Rules 2016 | 90 | Pre-Operation | If applicant deals with plastic waste | |||
Uttar Pradesh Fire Services Website Link |
NOC from Fire Department (prior to commencement of construction activities) or Provisional | 15 | Pre-Establishment | Mandatory | ||
Uttar Pradesh Power Corporation Limited Website Link |
Power Connection | 30 | Pre-Operation | If applicant require power connection | ||
Forest and Wildlife Department Website Link |
NOC for Tree Felling | 15 | Pre-Establishment | If applicant wants to cut tree | ||
Registrar Firms Societies and Chits Website Link |
Registration of Partnership firms, Society | 30 | Pre-Establishment | If applicant wants to register Firm or Society | ||
Public Works Department Website Link |
Road Cutting Permissions | 7 | Pre-Operation | In case applicants wants cut road | ||
Directorate of Electrical Safety Website Link |
Initial Inspection of Low Voltage Installation | 4 | Additional Service | If applicant require power connection | ||
|
Building Plan Approval | 15 | Pre-Establishment | In case applicant wants to construct building | ||
Occupancy Certificate | 25 | Pre-Operation | In case applicant wants to obtain Occupancy Certificate | |||
Urban Department Website Link |
Water Connection of Industrial Water | 15 | Pre-Operation | In case applicant wants a water connection |